SECOND POWER PLANT OF SHAHID ABBASPOUR DAM‎

PERIOD:‎ ‎1994 – 2010‎

EMPLOYER:‎ Khuzestan Water and Power Authority

TECHNICAL SPECIFICATIONS:‎ Total length of tunnels is 3300 m, total length of vertical ‎shafts is 600 m, total length of grouting and drainage ‎galleries is 1032 m, dimensions of powerhouse cavern are ‎‎145x26x49 m, total excavation volume is 460,000 m3, total ‎concrete volume is 200,000 m3, total reinforcement weight is ‎‎17,000 tons, total length of grout curtain is 30,000 m, ‎total length of drainage curtain is 10,000 m, four 250-MW ‎vertical Francis turbines.‎

LOCATION:‎ ‎55 km away from northeast of Masjed Soleyman, and 49 km away ‎from estuary of Karun river

STAGE:‎ Permanently delivered

MOSHANIR’S ROLE:‎ Designing and supervision on construction work of all parts ‎of powerhouse and auxiliary structures such as powerhouse, ‎T.O.Y., tunnel 7, headrace, intake, tailrace as well as ‎remaining work of 400 kV substation.‎

 